PROVIDENCE TOWER HEALTH CLUB & GYM

PROVIDENCE TOWER HEALTH CLUB & GYM

PROVIDENCE TOWER HEALTH CLUB & GYM Project overview Feature Wall Panelling Bespoke Joinery Entrance Portal Flooring Glass partitioning Toilet and Changing Cubicles Lockers Bespoke Glass Works Gym Fit Out Feature Ceilings PROJECT IMAGES Back to Portfolio Like What...
LONDON CITY ISLAND

LONDON CITY ISLAND

LONDON CITY ISLAND Project overview Marketing Suite Bathroom and Kitchen Fit Out Wardrobes Model Stands Feature Signage Bespoke Metal Works Centre Piece Display Shelving Shower Screens Bedheads Feature Ceiling Gym Fit Out Monkey Bars Feature Ceiling Raft Lockers...
THE CHILTERNS

THE CHILTERNS

THE CHILTERNS Project overview Feature Glass Walls Bespoke Wall Panelling Joinery Changing Room Joinery Bathroom Joinery Vanity Units Base and Wall Units PROJECT IMAGES Back to Portfolio Like What You See? Contact...
PINE TREES

PINE TREES

PINE TREES Project overview Refurbishment of Reception Area Wall Panelling Glass Panelling Reception Desk Feature Wall Unit Bespoke Lighting and Decorations PROJECT IMAGES Back to Portfolio Like What You See? Contact...
COOPERS HALL

COOPERS HALL

COOPERS HALL Project overview Full Bathroom Strip Out and Re-Fit Wall and Floor Tiling Vanity Units Mirrors Doors Decorative Finishes Refurbishment of Existing Front Door PROJECT IMAGES Back to Portfolio Like What You See? Contact...
STANMORE PLACE

STANMORE PLACE

STANMORE PLACE Project overview Office Fit Out Flooring Ceiling Doors Partitioning Kitchen Fit Out Toilet Fit Outs Vanity Units Shower Room Fit Out Storage Units PROJECT IMAGES Back to Portfolio Like What You See? Contact...

Ireland

In order for Crofton Interiors to help you in the most effective and efficient way possible, your enquiry should have a specification which includes:

The Fire resistance Eurocode Classification. For Doors and Screens separately e.g. E 30, EI 30, E 60, EI 60, EI 1201
Glass Joints Butt Jointed Glass-to-Glass joints or Fully Framed Glass panes Door Functionality Latched on Lever handles/ Unlatched Non rebated on Push/Pull Handles/ Panic Function (EN 179 or EN1125).2
Paint Specification Standard RAL or Metallic RALAcoustic requirements
Steel Type Mild steel or Stainless Access Control Requirements Maglock / Electric Lock / Electric Strikes
Floor Plan Drawings Elevation Drawingsshowing the layout of the glazed screens and doors
Bill of Quantities or Schedule

1 Non-Eurocode fire classifications for Glazing Systems (e.g. ambiguous descriptions such as “FD30”, “30/30”, “30 minutes” “FR30”) are a thing of the past and are the single biggest factor causing serious regulatory and cost increase issues across the industry from enquiry stage to Practical completion. Getting this right is half the battle.

2 If this is not known, please let us know the building tenancy arrangements (single/multiple), floor occupancy factor, perceived frequency of use of the door.

Some notes for your consideration:

  • The Acoustic Ratings offered by all Glazed Office Partitioning Contractors are dB Rw which means that the stated dB Rw acoustic rating (weighted sound reduction index for the human ear) of the system is the rating achieved under laboratory test conditions in accordance with EN ISO 717: 2013 (still current as at March 2020). It is not possible or advisable for a Glazing subcontractor to prove or offer a site tested result (dB R’w) due to various site specific factors, the most relevant one being flanking sound transmission through the structures that the glazed partition is affixed to.
  • Expect a site test result to always be less than the result of laboratory test conditions.
  • Most doors will have a lesser acoustic rating than the screens they are installed into.