IPS DUCT PANELS & HEALTHCARE

Panelling:

Crofton Interiors continue to offer choice to our customers via our extensive range of options for panelling and integrated sanitaryware systems. Our options will allow you to cater for your specific site requirements:

1. VEPPS IPS Pre-Plumbed

Our integrated plumbing system offers a bespoke speedy one-stop-shop solution which includes for a metal framed, factory made system that comes completed with fitted sanitaryware.

2. Metal Frame Duct

This option offers the strength and ease of installation of a metal frame system combined with the flexibility to specify your own santiaryware.

3. Timber Frame Duct

Conventional, functional and cost effective, our panelling system is constructed onto a timber frame to site requirements.

Healthcare:

VEPPS IPS Healthcare is supplied to meet the rigorous Government regulations surround healthcare facilities and the increased public awareness of issues such as MRSA bugs. Our range allow you to specify with confidence and to ensure that the required systems are fully compliant, tested and proven in the most demanding of environments.

PRODUCT IMAGES

Like What You See?

Ireland

In order for Crofton Interiors to help you in the most effective and efficient way possible, your enquiry should have a specification which includes:

The Fire resistance Eurocode Classification. For Doors and Screens separately e.g. E 30, EI 30, E 60, EI 60, EI 1201
Glass Joints Butt Jointed Glass-to-Glass joints or Fully Framed Glass panes Door Functionality Latched on Lever handles/ Unlatched Non rebated on Push/Pull Handles/ Panic Function (EN 179 or EN1125).2
Paint Specification Standard RAL or Metallic RALAcoustic requirements
Steel Type Mild steel or Stainless Access Control Requirements Maglock / Electric Lock / Electric Strikes
Floor Plan Drawings Elevation Drawingsshowing the layout of the glazed screens and doors
Bill of Quantities or Schedule

1 Non-Eurocode fire classifications for Glazing Systems (e.g. ambiguous descriptions such as “FD30”, “30/30”, “30 minutes” “FR30”) are a thing of the past and are the single biggest factor causing serious regulatory and cost increase issues across the industry from enquiry stage to Practical completion. Getting this right is half the battle.

2 If this is not known, please let us know the building tenancy arrangements (single/multiple), floor occupancy factor, perceived frequency of use of the door.

Some notes for your consideration:

  • The Acoustic Ratings offered by all Glazed Office Partitioning Contractors are dB Rw which means that the stated dB Rw acoustic rating (weighted sound reduction index for the human ear) of the system is the rating achieved under laboratory test conditions in accordance with EN ISO 717: 2013 (still current as at March 2020). It is not possible or advisable for a Glazing subcontractor to prove or offer a site tested result (dB R’w) due to various site specific factors, the most relevant one being flanking sound transmission through the structures that the glazed partition is affixed to.
  • Expect a site test result to always be less than the result of laboratory test conditions.
  • Most doors will have a lesser acoustic rating than the screens they are installed into.