Providence Gym Cat A & B Works including Bespoke, M&E & Furniture Supply

Client: Ballymore
Site: Providence Gym, London
Timescale: 24 weeks

Scope of Works:

Gym fit out underneath a 35-level tower of flats, works based over two levels, works consist of:

  • Bespoke joinery
  • Bespoke juice bar
  • Bespoke reception
  • Bespoke stairwell
  • Bespoke flooring
  • Polished concrete
  • Plastering / Drylining
  • Painting and decorating
  • Tiling
  • Lighting
  • Doors
  • Fire rated glazed partitioning
  • Mirrors
  • Bespoke holding bars
  • Bespoke signage
  • Loose soft furniture supply
  • Toilet cubicles
  • Pool area
  • Murals
Gym with equipment and exposed ceiling
Gym changing room toilet area with sinks and mirrors
Gym changing room lockers with bench seating and hair drying station.
Gym with glass partition wall and exposed ceiling

Download Case Study