Millharbour Lounge, Cat A & B Fit-Out including M&E

 
Client: Ballymore
Site: Canary Wharf, London
Timescale: 8 weeks
 
Scope of Works:

Hospitality lounge fitout, works consist of:
 

  • Bespoke joinery throughout
  • Bespoke bar, including brass fittings
  • Leather panelling
  • Metalwork
  • Bespoke worktop
  • Fittings and fixtures
  • Acoustic wall panelling
  • Ceiling finish
  • Flooring finishes
Lounge bar with walls decorated with timber cladding
Wine rack with gold effect
Lounge bar with seating area, walls decorated with timber cladding
Lounge bar with seating area, decorated with timber cladding

Download Case Study