Berkley Homes Cat A & B Works including M&E & Furniture Supply

Client: Berkley Homes
Site: 250 City Road, London
Timescale: 30 weeks

Scope of Works:
• Complete Cat A & B Office Fitout, 5 Floors
• Furniture Supply
• Bespoke Works
• Marketing Suite
• Reception Area

Lobby fit out located on the ground floor, high end fitout to all elements, based over 2 buildings.
I-Basin office space spans over five floors, works consist of:
• Tiling
• Bespoke joinery
• Flooring
• Plastering / Drylining
• Painting and decorating
• Doors
• Stair balustrade works
• Fire rated glazed partitions
• Bespoke signage
• Furniture Supply

Show flats 2no. located on levels 10 and 18. Works consist of:
• Tiling
• Plastering / Drylining
• Painting and decorating
• Marketing Suite works located on the ground floor

Open plan office reception area, featuring a relaxing waiting area with sofas and coffee tables
Commercial office reception waiting area, with comfortable seating and shelf running the length of the window
Meeting room with long table and timber chairs, wood effect flooring and exposed ductwork ceiling
Glazed meeting room partitions, with black metal frames. Timber flooring and exposed ductwork on the ceilings.

Download Case Study